A few shower doors we have installed this week

This gallery contains 3 photos.

                                     

More Galleries | Leave a comment

Remodel for Dave and Bree M.

 This shower remodel took place on the Southwest part of town. We  removed the shower enclosure, surround, tub splashes and pan. (We reused the tub and plumbing.) Replaced wallboard with moisture resistant sheetrock. No more leaks or mold for this shower and tub!

 

The shower surround was replaced with vibrant white on white cultured marble. This bathroom was completed in 2 weeks and the cost was under 4k. The homeowners upgraded to a frameless shower door with chrome hardware to finish the job off. 

Thanks again Dave and Bree!

Posted in Uncategorized | Tagged , , , , , , , | Leave a comment

Master Bathroom Remodel for Ken and Sarah G.

This is a bathroom we did in the Northwest side of the valley. We did the following work: Continue reading

Posted in Uncategorized | Leave a comment

Shower Doors

Here are a few showers doors we’ve installed this month.

Posted in Uncategorized | Tagged , , , , , , , , | Leave a comment

Shower remodel for Mike and Elizabeth D.

 

Before

After

We did this shower near the south end of Las Vegas. The tiles on the walls were coming loose and leaking so we removed the entire shower portion including half the ponywall and the shower pan, replumbed the shower with the Moen “Kingsley” line in oil rubbed bronze, installed our popular Walnut Brown and White on Natural cultured marble, and then finished it off with a nice frameless  shower door with oil rubbed bronze finish.

The job took 2 weeks and came in under $4.5k

Thank you Mike and Elizabeth.

 

Posted in Uncategorized | Tagged , , , , , , , , , , | 1 Comment

Shower Remodel for Larry and Ruth A.

Finshed

Customer in Henderson had a leaky shower so we kept the tub side as-is and replaced the shower side only. We started by carefully removing the the shower walls and pan, making sure not to damage the rest of the tile, we then  replaced the plumbing with a new Moen “Montecello” valve and shower head in gold finish, the marble we used was Heather and White on White which has a light violet vein and looked great with the existing tile. Lastly we finished it off with a nice semi-framless shower enclosure (1/4″ clear glass and gold finish)

This is a great option for anyone who wants to replace their leaky shower while avoiding the cost of a full remodel.

We completed this shower in less the 2 weeks and for less than $4K.

Thank you Larry and Ruth we hope you enjoy your new shower.

Posted in Projects | Tagged , , , , , , , , , , , | 1 Comment

Master Bath Remodel for Jack and Siriwon S.

We just finished another good sized job in southeast Vegas. We started by removing ALL the tile in the shower, on the Vanity-tops and around the tub. Then we removed a low hanging header at the entry to the shower to open the shower up more, and framed shelf areas next to the tub. Our plumber replumbed everything with the Moen “Kingley” line in oil rubbed bronze finish, then we installed a nice Mexican Sand and White on Natural cultured marble. We finishd it off with a new semi-framless shower door and new mirrors with a nice beveled edge.

We completed the bathroom in less than 2 weeks and for around $8.5k

Thank you Jack, Siriwon, and Jackie!

Posted in Projects | Tagged , , , , , , , , , , , , , , , , | Leave a comment

Bathroom Remodel for Joe and Maureen K.

Just finished a good sized bathroom (Last of 3 bathrooms we did for cust.) near south end of Vegas. We started by tearing out everything but the cabinets, mirrors and flooring. Then we framed up a new tub deck for their new Kohler tub, replumbed everything with the Moen “Icon” line, installed Kohler drop in bowls, installed our Level 3 Arrowwood cultured granite with a solid white cultured marble shower pan for contrast, then finished it off with a frameless shower door in chrome finish.

We were able to complete the entire job in two weeks and for approx. $12.5k

Thank you Joe and Maureen

Posted in Projects | Tagged , , , , , , , , , , , , , | 4 Comments

Shower Remodel for Niclas and Corinne B.

 
 

Before

After

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Here is a shower we did in the Henderson area. We removed the existing shower, framed pony walls, plumbed with Kohler plumbing (customer supplied his own plumber and parts), installed a Walnut Brown White on White cultured marble shower walls and pan, and a frameless steam shower door with Oil Rubbed Bronze finish.
 
We completed this shower in less then 2 weeks at a cost of approx. $7k
 
Thank you Niclas and Corine, you guys were great to work with.
Posted in Projects | Tagged , , , , , , , , , , | Leave a comment

Shower & Vanity Top Remodel for Robert N.

Before

After

 

 

 

 

 

 

 

 

 

 

 

 

Here is a job we completed in Henderson. We removed his existing vanitiy top, shower surround, and tub splashes (Saving his tub which was still in great shape). We installed a beautiful Level 2 cultured granite (Honeycomb with Walnut Brown veins), re-plumbed everything with the Moen “Kingsley” line in Oil Rubbed Bronze. Then finished it off with a frameless shower door (3/8″ clear tempered glass and Oil Rubbed Bronze finish). 

We were able to complete the job in less than 2 weeks and for around $7500.00

Thanks again Bob, it was a pleasure working with you!

After

 

 
Posted in Projects | Tagged , , , , , , , , , , , | Leave a comment