Remodel for Dave and Bree M.

 This shower remodel took place on the Southwest part of town. We  removed the shower enclosure, surround, tub splashes and pan. (We reused the tub and plumbing.) Replaced wallboard with moisture resistant sheetrock. No more leaks or mold for this shower and tub!

 

The shower surround was replaced with vibrant white on white cultured marble. This bathroom was completed in 2 weeks and the cost was under 4k. The homeowners upgraded to a frameless shower door with chrome hardware to finish the job off. 

Thanks again Dave and Bree!

This entry was posted in Uncategorized and tagged , , , , , , , . Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>