Shower remodel for Mike and Elizabeth D.

 

Before

After

We did this shower near the south end of Las Vegas. The tiles on the walls were coming loose and leaking so we removed the entire shower portion including half the ponywall and the shower pan, replumbed the shower with the Moen “Kingsley” line in oil rubbed bronze, installed our popular Walnut Brown and White on Natural cultured marble, and then finished it off with a nice frameless  shower door with oil rubbed bronze finish.

The job took 2 weeks and came in under $4.5k

Thank you Mike and Elizabeth.

 

This entry was posted in Uncategorized and tagged , , , , , , , , , , . Bookmark the permalink.

One Response to Shower remodel for Mike and Elizabeth D.

  1. Wilma says:

    What a great blog

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>